Women's Curved V-Neck Print Top Peace Love Paws | 1797-PLPW

Low stock
Product Description
Product Description
Show off your passion for caring with the Maevn Peace Love Paws Print Scrub Top. Featuring an adorable all-over pattern of colorful paw prints, hearts, and peace signs on a classic black background, this cheerful print brings personality to every shift. It's the perfect choice for veterinary clinics, animal hospitals, pet groomers, shelters, and anyone who loves working with animals.
Crafted from a soft 92% polyester / 8% spandex stretch fabric, this scrub top delivers lightweight comfort with the flexibility you need to stay comfortable throughout your day. The durable fabric moves with you while maintaining its vibrant appearance, making it an excellent choice for busy healthcare and veterinary environments.
Designed with Maevn's modern fit, this top features front princess seams and back darts that create a flattering silhouette without sacrificing comfort. Two front slant pockets keep everyday essentials close at hand, while side vents provide additional freedom of movement as you bend, reach, and care for your patients. A solid contrast back facing adds a thoughtful finishing touch to this polished print top.
Pair the Peace Love Paws scrub top with your favorite solid scrub pants to create a fun, professional look that's sure to brighten your day—and everyone else's.
Key Features
- Exclusive Peace Love Paws animal-inspired print
- Ideal for veterinary clinics, animal hospitals, pet groomers, and shelters
- Modern fit with front princess seams and back darts
- Soft four-way stretch feel
- Durable 92% polyester / 8% spandex fabric
- Two front slant pockets
- Solid contrast back facing
- Side vents for enhanced mobility
- Lightweight, comfortable fabric for all-day wear
Specs
- Collection: Maevn Prints
- Print: Peace Love Paws
- Fit: Modern
- Pockets: 2 front slant pockets
- Fabric: 92% Polyester / 8% Spandex
- Center Back Length: 26.5" (Size Small)
- Imported
Couldn't load pickup availability
See What’s Happening in Our Stores
Leesburg – Danay looks EPIC in her new scrubs!
Macon – The must have accessories!
Pinehurst – Epic for the Win!
Asheville – Blood donation for Battle of the Badges
Savannah – Neon pink Dansko – Yes Please!
Spartanburg – Green with Envy!

