Women's Curved V-Neck Print Top Floral Daze | 1797-FLDZ

Low stock
Product Description
Product Description
Brighten every shift with the Maevn Women's Curved V-Neck Print Scrub Top in Floral Daze. Featuring an artistic watercolor blend of lavender, plum, blush, and golden blooms, this eye-catching floral print adds fresh color and feminine style to your professional wardrobe. Whether you're caring for patients in a hospital, medical office, dental practice, veterinary clinic, or school, Floral Daze delivers the perfect balance of beauty and performance.
Crafted from a soft 92% polyester / 8% spandex stretch fabric, this scrub top offers lightweight comfort with the flexibility to move effortlessly through even the busiest days. The modern fit creates a flattering silhouette, while front princess seams and back darts provide feminine shaping without restricting movement. A solid contrast back facing adds a polished finishing touch that elevates the overall design.
Built for busy healthcare professionals, this scrub top also delivers the function you need every day. Two front slant pockets provide convenient storage for your essentials, while side vents promote greater mobility as you bend, reach, and move throughout your shift. The curved V-neckline completes the look with a timeless, flattering finish that pairs beautifully with your favorite scrub pants.
Coordinate Floral Daze with Eggplant, Wine, Ceil Blue, Black, or White scrub pants for a polished look that's as vibrant as your personality. Soft, colorful, and effortlessly wearable, this floral print is a beautiful choice for every season.
Key Features
- Floral Daze watercolor floral print
- Vibrant shades of lavender, plum, blush, and golden yellow
- Modern fit with flattering front princess seams and back darts
- Curved V-neckline
- Soft stretch fabric for all-day comfort
- Two front slant pockets
- Solid contrast back facing
- Side vents for enhanced mobility
- Coordinates with Eggplant, Wine, Ceil Blue, Black, and White scrub pants
Specs
- Fit: Modern
- Fabric: 92% Polyester / 8% Spandex
- Pockets: 2 front slant pockets
- Body Length (Size Small): 26.5"
Couldn't load pickup availability
See What’s Happening in Our Stores
Leesburg – Danay looks EPIC in her new scrubs!
Macon – The must have accessories!
Pinehurst – Epic for the Win!
Asheville – Blood donation for Battle of the Badges
Savannah – Neon pink Dansko – Yes Please!
Spartanburg – Green with Envy!

